Public Notice - SEPA Determination of Non-Significance Camas Proposed Updates to Existing Well 13 Facility Including Installation of PFAS Treatment Equipment (File No. CUP25-1002)
Case No: |
CUP25-1002: Proposed Updates to Existing Well 13 Facility Including Installation of PFAS Treatment Equipment |
Applicant: |
Mike Odren, MacKay Sposito 18405 SE Mill Plain Blvd. #100 Vancouver, WA 98683 |
Request: |
Conditional Use Permit, Design Review, Critical Area, Archeological, and SEPA Review for updates to existing Well 13 including installing per- and polyfluoroalkyl substances (PFAS) treatment equipment, new generator, building additions, new well and driveway access on approximately 0.56 acres, situated in the MF - 18 Multi-Family Residential Zone. |
Location: |
1250 E. 1st Avenue, Camas, WA 98607 Parcel Numbers 90928000, 91031000 and 91034000 |
Legal Description: |
The project is located in the City of Camas in the NE ¼ of Section 11 and Northwest ¼ of Section 12, Township 1 North, Range 3 East of the Willamette Meridian |
SEPA Determination: |
Determination of Non-Significance (DNS) |
Comment Deadline: |
May 1, 2025, at 5:00 p.m. |
As lead agency under the State Environmental Policy Act (SEPA) Rules [Chapter 197-11, Washington Administrative Code (WAC)], the City of Camas must determine if there are possible significant adverse environmental impacts associated with this proposal. The options include the following:
- DS = Determination of Significance (The impacts cannot be mitigated through conditions of approval and, therefore, requiring the preparation of an Environmental Impact Statement (EIS).
- MDNS = Mitigated Determination of Non-Significance (The impacts can be addressed through conditions of approval), or;
- DNS = Determination of Non-Significance (The impacts can be addressed by applying the Camas Municipal Code).
Determination:
Determination of Non-Significance (DNS). The City of Camas, as lead agency for review of this proposal, has determined that this proposal does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(e). This decision was made after review of a completed environmental checklist, and other information on file with the City of Camas.
Date of Publication & Comment Period:
Publication date of this DNS is April 17, 2025, and is issued under WAC 197-11-340. The lead agency will not act on this proposal until the close of the 14-day comment period which ends on May 1, 2025. Comments may be sent by email to communitydevelopment@cityofcamas.us or regular mail to:
City of Camas SEPA Official
Community Development Department
616 NE Fourth Avenue
Camas, Washington 98607
Responsible Official: Robert Maul (360) 817-1568
4/17/25
Robert Maul, Planning Manager and Date of publication
Responsible Official