Menu Settings

Long-Range Planning

Do you wonder what the City will look like in 20 or 30 years? 

These visions and plans for the future are found within the city's comprehensive plan documents which include: City of Camas Comprehensive Plan; City of Camas Capital Facilities Plan; the Park, Recreation and Open Space Comprehensive Plan; Camas Shoreline Master Program; Six-year Street Plan; and the Neighborhood Traffic Management Plan. Community Development Department is involved with maintaining these documents and is responsible for updating them as required by state statutes.

Camas Shorelines Master Program

Camas shorelines are protected by local, state and federal laws. Check before making changes to shorelines. The City's Shorelines Master Program (SMP) helps you navigate the law and preserve these spaces for all who rely on them. Camas and its urban growth boundary have 946 acres on 26 miles of shorelines — along Lacamas Creek, Fallen Leaf Lake, Lacamas Lake, Round Lake, and the Columbia and Washougal rivers. This City-owned land is habitat — for people, but also for plants, birds, fish, mammals and insects.

Development Services

Wonder what development review is all about? Contact a City Planner to discuss your plans from a “sketch-on-a-napkin”, all the way to a final Certificate of Occupancy.

For those of you who are more experienced developers, the rules and regulations that guide the development of property are within Titles 16, 17, and 18 of the Camas Municipal Code.

Planning Division

Welcome to the City of Camas Planning Division

This division is responsible for:

Building Construction Standards

  • 2021 I-Codes Building Code
  • Roof Snow Load - 25 psf
  • Wind Speed (Gust) - 97 mph*, 3 second, Exposure B, Risk Category II
  • Seismic Design Category - D 1
  • Weathering Frost Line Depth - 12"
  • Termites - Slight
  • Decay - Moderate
  • Winter Design Temp - 22 deg F
  • Ice Shield Underlay - No
  • Flood Hazard - See FEMA maps
  • Air Freeze Index - 250
  • Mean Annual Temp - 50 deg

*Wind speed based on current adopted ASCE-7 standard.

Building FAQs & Resources

Building FAQs
Work Type Yes/No

Pages