Load Full Menu

Based on public input and in-depth analysis, the City of Camas project team has recommended a roundabout to improve the intersection of NE Lake Road-NE Everett Street. Two designs are being considered. Which do you prefer? Offer your opinion through April 20! –> http://bit.ly/Lake-EverettSurvey2

Need more info?
View the presentation shown at Community Open House 2, held April 9, to see:
– How the public has been involved in this process;
– How the analysis was performed and applied; and
– *VIDEO SIMULATIONS* of intersection options.
–> http://bit.ly/Lake-EverettCOH2

Those video simulations are also available here:

o Video: No-Build Signal – traffic projected for the year 2040 if the intersection were left as it is today: https://vimeo.com/329384208/84cd56461a

o Video: Built-Out Signal – traffic projected for the year 2040 if the intersection were improved with a new signalized format: https://vimeo.com/329384192/118082e01a

o Video: Roundabout Operation – traffic moving around Roundabout Preferred Concept 1: https://vimeo.com/329384281/4b14d9865d

o Fly-Through Video: Roundabout Option 1 – offering a "fly-through" aerial view of Roundabout Preferred Concept 1 in 3-D model: https://vimeo.com/329384223/5d869c0de7

For a full project background, including the many public involvement opportunities underway, visit www.cityofcamas.us/lakeroad

Camas Public Works News

Public Works Administration
616 NE 4th Avenue
Camas, WA  98607
360.817.1563

Operations Center
1620 SE 8th Avenue
Camas, WA  98607

Engineering
360.817.1561

Inspection Line
(to request an inspection)
360.834.8860

Sanitation
360.817.1564
hotline 360.817.1531

Street Department
360.817.1565

Water & Sewer
360.817.1567
For utility payments
or changes to accounts
360.834.2462

Waste Water Treatment Plant
1129 SE Polk Street
360.834.3263

After Hours Utility Emergencies
360.737.0592

Illicit Discharges (IDDE) Hotline
360.817.1565

Ecology
360.407.6300

My Camas
Go to top