Load Full Menu

CONSTRUCTION PROJECT NEWS (Not all active projects are highlighted) 

  • Brady Road Improvements


    PROJECT DETAILS: This project will upgrade NW Brady Road beteen NW 16th Avenue and NW Pacific Rim BLVD. Reconstruction and widening of the existing roadway to accommodate one-lane in each direction, raised medians, left-turn lanes, bicycle and pedestrian access, curbs, illumination, storm water...
    Read More ...

  • Bridge Project - 3rd Avenue Bridge


    3rd Avenue Bridge seismic retrofitThe NE 3rd Avenue Bridge in Camas is a two span structure carrying 4 lanes of traffic over the Washougal River.  The bridge is comprised of two side by side structures, the first being a 1947 steel girder bridge which was then widened in 1970 with a concrete...
    Read More ...

  • Camas Community Aquatics Center


    On July 15, 2019, City Council passed an ordinance to place a bond levy of up to $78 million on the Nov. 5, 2019, ballot. We invite you to read about the project and take part in upcoming events! View full project details, including facility renderings and citizen comments, at:www.CamasCommunityAquaticsCenter.com...
    Read More ...

  • City Annexation Building - Downtown 3rd and Everett Street


    In December 2018, the City purchased the building located across the street from City Hall (Previously home to Bank of America). City staff are currently in the process of completing a space and use study for departments and services at City Hall to finalize decisions of the services that will be...
    Read More ...

  • Crown Park


    The City is in the design and planning phase for the development of Crown Park.    For further information please call the Public Works Department at 360.817.1563. For more information about City of Camas Parks Projects: Crown Park Master Plan Final Crown Park Master Plan Crown Park Master Plan Crown...
    Read More ...

  • Fallen Leaf Improvements


    For more information about City of Camas Parks Projects including Fallen Leaf: http://www.cityofcamas.us/parkshome/68-parkscat/819-parksprojects  
    Read More ...

  • Green Mountain Mixed Use PRD


    PROJECT DETAILS:   Green Mountain Mixed Use PRD, is an approved 1,300 lot subdivision located on the former Green Mountain Golf course at the intersection of NE Goodwin Road and NE Ingle Road. The project will be constructed in multiple phases over the new few years in addition to the residentaial...
    Read More ...

  • Lake Road and Everett Intersection


    NE Lake Road and NE Everett Street Intersection Improvement Project The City of Camas is in the secondary stages of an intersection improvement project for the NE Everett Road (State Route 500) and NE Lake Road intersection. This is a critical intersection for the community, connecting the north...
    Read More ...

  • Larkspur and Camas Meadows Street Improvements


    PROJECT DETAILS:  Reconstruction and widening of the existing roadway to accommodate one-lane in each direction with a raised island, left turn lanes, stormwater collection and treatment, sidewalks, signing, street lighting, and other improvements. The project is partially funded by a State...
    Read More ...

  • North Shore Transmission System Project


    North Shore Sewer Transmission System Project Current and Upcoming Work Leadbetter Road – Leadbetter Road is currently under construction between 9th Street and the boat launch to install water and sewer improvements. Leadbetter Road will be CLOSED at this location to all traffic except for local...
    Read More ...

  • Oak Park Community Center Renovations


    The City is in the design and planning phase for the repairs and improvements to the Oak Park Community Center.    For further information please call the Public Works Department at 360.817.1563.  
    Read More ...

  • Parks and Open Space including Lacamas Legacy Lands


    Partnership for development of a dog park in Fern Prairie For further information about these projects please call the Public Works Department at 360.817.1563. Lacamas Legacy Lands - Update January 2019 The city has been making great progress on acquiring property in support of the Legacy Lands...
    Read More ...

  • Skate Park Improvements


    The City is in the design and planning phase for the  improvements to the 3rd Avenue Skate Park.    For further information please call the Public Works Department at 360.817.1563.  
    Read More ...

  • Stormwater Construction Projects for 2019


    The following is a list of the City’s Public Works Capital Projects that will be happening within and around the City with regard to Stormwater improvements in 2019.  For further information about these projects please call the Public Works Department at 360.817.1563. Columbia Summit 2a Cascade...
    Read More ...

  • Street Construction Projects for 2019


    The following is a list of the City’s Public Works Capital Projects that will be happening within and around the City with regard to Street Maintenance, Street Lights, and other road improvements in 2019.  For further information about these projects please call the Public Works Department at...
    Read More ...

  • Trails and Open Space Development for 2019


    The following is a list of the City’s Public Works Capital Projects that will be happening within and around the City with regard to Trails and Open Space in 2019.  For further information about these projects please call the Public Works Department at 360.817.1563. 3rd Avenue Trail – Old Town 3rd...
    Read More ...

  • Water and Sewer Construction Projects for 2019 Season


    The following is a list of the City’s Public Works Capital Projects that will be happening within and around the City to improve, upgrade, or replace capital facilities and infrastructure in 2019. For further information about these projects please call the Public Works Department at 360.817.1563. ...
    Read More ...

  • Wetland Mitigation Projects for 2019


    The following is a list of the City’s Public Works Capital Projects that will be happening within and around the City with regard to Wetland Mitigation in 2019. For further information about these projects please call the Public Works Department at 360.817.1563. NW 38th Avenue – Grass Valley Phase...
    Read More ...

  • Zone Water Main and Treatment (2017 Water Transmission Main, Ph 3)


    PROJECT DETAILS:  Replacement of waterline that was installed in the 1920’s located between NE 312th/Ireland Road and the new Slow Sand Water Treatment Plant on Lessard Road. CONTACT: engineering@cityofcamas.us  Status:
    Read More ...

For Timely Construction Alerts
Follow us on TWITTER @camasprojects

My Camas
Go to top